AG真人国际·[中国]官方网站

En

Subway Air conditioning project - Guangzhou Metro Line 6 and 21

Project Introduction

The second stage of Guangzhou Metro Line 6 is about 17.4km, with 10 stations. The length of line 21 is about 61.5km, with 20 stations. Hanbell. 78 units of Hanbell RC2-E compressors are used.

image.png